RBQ: 5824-9764-01 Assurance pollution
FR EN

Start with the right service

When a building shows more than one issue at the same time, it is not always obvious whether you should begin with sampling, decontamination, mould remediation, vermiculite removal or selective demolition. The cards below help point you to the most useful next step.

Frequently asked questions

What is the best first step if I am not sure what the material is?

When the material is still uncertain, sampling is often the best starting point. It helps confirm the real condition of the site and avoids moving in the wrong direction.

When should I choose decontamination instead of selective demolition?

Decontamination is generally the right fit when the priority is hazardous or contaminated materials. Selective demolition is the better fit when sections of the building must be opened or removed in a controlled way.

Can sampling help before decontamination work starts?

Yes. Sampling is often the best way to confirm the presence or absence of asbestos or other contaminants before decontamination or demolition begins.

Demandez votre soumission gratuite

Décontamination, vermiculite, échantillonnage et démolition